Original wall Door into kitchen still in place. April 4th
Underneath the stairs Opening half bathroom wall gives a view of framing. May 27th
Most of the framing has to stay Except for the cutoff lumber above the air return. May 30th
Highest point Wall behind kitchen desk on left
Holes and drawing Kerri made nail holes at corners and I drew pullout locations
Cabinet idea overlaid The face of the pullouts hides the odd size/spacing.
Cutouts Holes cut with supports for cabinet boxes added. June 8th
Interior View of supports inside
Cutouts Air return grill removed. July 1st
Access for wiring Network and electrical for kitchen desk. July 30th
Cabinet install started After vacation - wood air return looks much better. August 25th.
Pullouts Showing the full extension pullouts
Two smaller pullouts Smallest is one sided
Gluing the trim Straight edge case and painter's tape roll do the job. August 27th
Remade middle door in place Nearly complete. August 29th
Last blue tape section Tall cabinet door attached. September 1st
Door fronts in place No pulls yet
Pullouts open Showing interior storage
Cabinet pulls installed Smooth, low profile handles. September 2nd.
View through to to the kitchen Finished hallway